Commercial Pier Columns

Long's Excavation & Construction excavated the soil, then the pier columns were put into place. The soil was placed back, then the buildings set in place. Piers were used so that conduits could be placed underground inside the building.

Completed: March 1996
Location: Amoco Pipeline, Ft. Laramie, WY